We met with the builder at the house today. Afterward I took pictures while Marlene tested exterior paint colors. The trim is mostly installed now, including the railing by the stairs.
Stair Railing
The oak, 2-panel doors are mostly installed also. The only doors not installed are those that were not delivered by the lumber yard.
Doors in Pete's Room
Pocket Door in Master Bath
Also the marble caps were installed on the shower threshold and the tub half-wall.
Marble Caps
And speaking of marble, my office tile was laid and grouted.
Office Tile
Marlene bought a couple samples of exterior paint to try on the siding. We chose the darker of the two.
Painting Test Colors
And this is what the front of the house looks like. Still no front door or porch columns.
West Face