Thursday, April 17, 2008

Oak Doors & Trim, Marble Caps & Floor

We met with the builder at the house today. Afterward I took pictures while Marlene tested exterior paint colors. The trim is mostly installed now, including the railing by the stairs.

Stair Railing

The oak, 2-panel doors are mostly installed also. The only doors not installed are those that were not delivered by the lumber yard.

Doors in Pete's Room

Pocket Door in Master Bath

Also the marble caps were installed on the shower threshold and the tub half-wall.

Marble Caps

And speaking of marble, my office tile was laid and grouted.

Office Tile

Marlene bought a couple samples of exterior paint to try on the siding. We chose the darker of the two.

Painting Test Colors

And this is what the front of the house looks like. Still no front door or porch columns.

West Face

Sunday, April 13, 2008

Bedroom & Bath Tile Laid

We went back on Sunday to check out the beautiful bathroom tile and take pictures. Marlene had picked out all these different tiles and the listello and it all looked fine to me. However, I was not prepared for how beautiful it looked when it was actually installed in the room. I was astonished.

Master Bath

Shower

Shower Detail

The bedrooms were tiled but not grouted yet.

Master Bedroom

Pete's Room

The oak trim is installed on the half-wall at the top of the stairs and going down. It looked better than I was expecting.

Oak Trim

My office was not tiled yet. Marlene had laid out the tile in a pleasing arrangement taking into consideration the amount of white veins in the black marble.

Tile Staged for my Office

Not only was there progress this week, but the tile looked better than I anticipated. How nice!