On Wed. (11/8) they dug out the septic drainfield. It turned out that the sand was at 16.5 ft instead of the expected 13.5 ft. For some reason that we still have not heard, the size of the field had to be increased from 1600 sq ft to 1800. Just more money poured into a hole in the ground. They backfilled with gravel on Thursday or Friday. We went out and looked on Sat. Thank you to our intrepid photographer Marlene.
More heavy equipment!
Guarding the gravel?