Friday, December 14, 2007

Basement Closed In

Thursday and Friday were busy days on the house. They framed in the south and east basement walls, set the steel I-beam, put the floor trusses in place and put on most of the floor decking. Expecting snow this weekend, they covered the openings with visqueen, covered the main floor with tarps and even put on a temporary plywood door.

Northeast corner.

Plastic window covering.

With the OSB sheathing in place and the "gangplank" leading up to the door, it almost looks like we are ready for extensive rains rather than just winter.

Anyone seen Noah?

Ready for snow.

It is a good thing they were thinking ahead. As I look out my window on Sunday a little after noon, I see a lot of snow blowing. We probably have 8 inches already and it is still snowing.