Concrete Poured

The insulation and temporary furnace dried out the house. They poured the concrete on Thursday, 3/13. The south side of the main floor, plus the master bath on the north side and the connector to the garage (laundry room, half bath, Mar's office) were all poured.

Looking east through the great room, Pete's bedroom and the master bedroom.

Southwest corner of the great room.

The Trombe wall in the great room is finished.

Master bath tub space.

The next picture shows the exterior without any snow, for a change. You can see the temporary furnace with the tube blowing into the west-most basement window. The propane tank that fuels it is between the porch and the garage. I am hauling a ladder in through the temporary front door to do some more wiring work.