Saturday, April 12, 2008

Great Room Tile and Cove

We stopped by the house on Saturday to drop off the recently purchased grout for my office tile. We were on our way to a meeting so we did not have much time to check things out. The tilers were hard at work as we poked our heads into the various rooms. A lot of progress was visible. The bathroom tile was especially pretty and the great room was moving along nicely. The edges of the room are now tiled and the cove for the indirect lighting has been installed. It is starting to look like a real room!

Great Room Edges Tiled

Cove In Great Room

When we went downstairs to see how they had done with the tile in my office, we were greeted with this unpleasant surprise.

Len's Office

There was more water outside the office, too.



We think (hope) that the water came from a hose not being turned all the way off and left lying on the basement floor. We have not had any water in the basement since they poured the floor until this point.

No comments: