Wednesday, July 30, 2008
A Digital Short (very short)
Homeowner Haiku
Wednesday, July 23, 2008
Moving Day Past
Maybe you missed it or maybe you were there for the adventure that was moving day! Stay tuned for further updates.
House occupied, though not quite completed...

If you came in through the garage, you would end up in the laundry room. Through the door is the kitchen. Note the pink moving day tag on the file cabinet. You'll see a few of those.
To the right of the washer and dryer is a half bath. Still waiting on the mirror, but now with added privacy bonus of a shade! Now anyone on the driveway can't see things they shouldn't.
From the kitchen this is the view of the great room (the "living room" half specifically, the other half is "dining room"). The giant fan above the couch and the plethora of windows makes the room really comfortable and breezy.
This is the kitchen as viewed from the great room. Just to the left out of the picture is the laundry room and the pantry. Just to the right out of the picture is the hallway to the bedrooms.
The pantry is enormous. (Imagine "enormous" in a slightly Scottish accent and John laughing his head off at me for being unable to pronounce normally! Hiccups destroy me...) It has two, very large, 6' tall rolling shelf carts to store things on. Very nice.
On down the hall. On the right, the first door is the guest bedroom. Likely to be the Pete Crash Pad during the school year.
Just across the hall from the guest bedroom is, appropriately, the guest bathroom, replete with chair for bathroom coaching. If you're like me and don't need any backseat driving while in the bathroom the chair functions well as a "set your stuff here while you take a shower" chair.

This is obviously just the shower, the big news on this being all the natural stone has been sealed and it is now usable! To the right, out of the picture, is a window, a big jacuzzi tub, another window, then 2 sinks, then a toilet room with a window.
The master bedroom has a walk-in closet as well. There is a window in there too! This picture only shows the left half. The right half bulges out a little bit and has a large IKEA closet unit in it.
And now on to the basement! It is largely unfinished. Those earlier posts of Norah and Kitty riding trikes around on the concrete still apply. The only room that is done is the office. To the right out of the picture is a double bookcase. 2 enormous windows! How will he ever get anything done with so much to look at!
The picture above shows the sunset over the hockey swamp from the dining room table. A week or so after this was taken, during family reunion, the grading was done on the yard. So it looked less weedy, more even, but still retained it's "possible amateur hockey rink in winter" appeal.
Well, that's all for this time. Stay tuned ....
Sunday, April 20, 2008
Geothermal Ground Loop In
Geothermal Trench
When they were about 200 feet from the house, they ran into an underground "river", as it was described to me over the phone. It turns out this just means there was more gravel in the clay and water was running through it. However, they need to head in a different direction to avoid it, so they took a sharp turn and headed east.
Geothermal Trench Sharp Turn
The back of the house looks kind of cool through the trees, almost like it is in the middle of a woods instead of a meadow.
Marlene setting up the picnin lunch.

The only change to the front of the house is a grayer color to the Trombe walls as they continue to get them smooth enough for the high-adsorptivity, low-emissivity film.
Still Smoothing Trombe Walls
While we were out there, Karen and Tim and kids stopped by after Mass. The girls looked cute in their dresses.
Picture taken at their house.
Michael enjoyed the view from my shoulders.
What a smile!

We ate lunch on the picnic table (how peaceful!) and then got to work on the painting. We were able to get the ceilings done in both bedrooms and my office.
Thursday, April 17, 2008
Oak Doors & Trim, Marble Caps & Floor
Stair Railing

The oak, 2-panel doors are mostly installed also. The only doors not installed are those that were not delivered by the lumber yard.
Doors in Pete's Room
Pocket Door in Master Bath

Also the marble caps were installed on the shower threshold and the tub half-wall.
Marble Caps
And speaking of marble, my office tile was laid and grouted.
Office Tile
Marlene bought a couple samples of exterior paint to try on the siding. We chose the darker of the two.
Painting Test Colors

And this is what the front of the house looks like. Still no front door or porch columns.
West Face
Sunday, April 13, 2008
Bedroom & Bath Tile Laid
Master Bath
Shower
Shower Detail
The bedrooms were tiled but not grouted yet.
Master Bedroom
Pete's Room
The oak trim is installed on the half-wall at the top of the stairs and going down. It looked better than I was expecting.
Oak Trim
My office was not tiled yet. Marlene had laid out the tile in a pleasing arrangement taking into consideration the amount of white veins in the black marble.
Tile Staged for my Office
Not only was there progress this week, but the tile looked better than I anticipated. How nice!
Saturday, April 12, 2008
Great Room Tile and Cove
Great Room Edges Tiled
Cove In Great Room

When we went downstairs to see how they had done with the tile in my office, we were greeted with this unpleasant surprise.
Len's Office
There was more water outside the office, too.
We think (hope) that the water came from a hose not being turned all the way off and left lying on the basement floor. We have not had any water in the basement since they poured the floor until this point.
Thursday, April 10, 2008
Tiling, Trim, Countertop Template
Master Bath Tile Started

The shower in the master bath is being done using a mud set (rather than the thin set being used elsewhere. It starts with a layer of mud applied to an expanded metal lath. We caught the tradesman, hard at work.
Mudding Shower
The tile in Pete's room was only a little further along than last we saw a couple days ago.
Pete's Room
The counter top guy was creating a template for the granite.
Kitchen Counter Top Template
We also caught the trim carpenter hard at work on the cove for the indirect lighting in the great room.
Cove Under Construction
Installing the Cove

The three attic access panels were trimmed in, too.
Foyer Attic Access
Tuesday, April 8, 2008
Tile and Oak Stairs Started
Bathtub Installed
Shower Base

Everything needed to be moved out of the great room and the bedrooms. A lot of it ended up stacked on the wood flooring.
Oak Floor As Storage Platform
The bulk of the great room has been tiled with a porcelainized ceramic tile. The edges, where tile cutting is required, remain to be finished.
Great Room Tiled
They were just starting to lay the tile in Pete's bedroom.
Pete's Room

And another crew was installing the oak risers and treads on the stairs.
Oak Stairs
And they continue to work on getting the exterior of the Trombe walls smooth. Most recently they ground the high spots off. You can see the white dust on the shingles to the east of the upper level Trombe walls.
Trombe Wall Exterior